Furring and Wiring Complete

The “guts” of our walls are complete, and Jeff at RVI is ready to seal them up behind fabric and panelling.

Here are some photos of what the inside of van walls looked like as the furring and wiring were being built. The photos are of wiring and wood, prior to placement of insulation. In the pictures, the upstairs is mostly complete and the downstairs is being built. Insulation then gets layered on top, and then the whole thing gets sealed behind wood or fabric.